TK Tu êbingen 089 SGH0199

Supplementary Products Trench Shoring

SITE ROAD SYSTEMS

KBS
KBS 1
KBS 2
IMG 0247

PLASTIC SITE ROAD.

  • TEMPORARY ROAD
  • LOW WEIGHT, HIGH LOAD CAPACITY
  • QUICK ASSEMBLY AND DISMANTLING

Fast, safe and economical: our plastic construction road is easy to lay, ensures optimum load distribution and can be used on almost any surface. It is also a real lightweight - and transport costs are correspondingly low. It is suitable for construction site access roads, road widening or storage areas, as well as a crane and assembly platform. Thanks to its width, it can be driven on by any type of lorry.


KEY DATA


Material:
High-density polyethylene

Characteristics:

  • Dimensions: 3,000 x 2,400 x 45 mm (also available as a variant for steel tracked vehicles)
  • Weight: 285 kg/panel
  • Load capacity up to 200 tonnes
  • Max. Max. speed 10 km/h



ADVANTAGES

  • Low weight, but high load capacity
  • Simple installation
  • High installation speed
  • No special vehicles required
  • Secures and protects the substrate
  • Cost-effective alternative to other temporary road systems
  • Safe and economical



    Technical Data

    Stahlbaustraße 1
    Stahlbaustraße 2
    Baustrasse Bild01 corr
    Header green

    STEEL CONSTRUCTION ROAD.

    Our E+S steel site road system provides great freedom of mobility as well as a host of technical options and broad scope for cutting costs. The site road consists of heavy-duty angles laid lengthwise and special profiles laid crosswise. Its simple design and special connectors make installation a very straightforward matter. The speed of laying is relatively high, as an excavator lifts the elements one after another from a reversing truck. The sections are then connected together with straps.

    SPECIFICATIONS

    • Dimensions: 2.340 mm x 3.800 mm x 160 mm
    • Weight: 869 kg
    • Load: 12 t axle load

    ADVANTAGES
    • For highest load requirements
    • Protection of the subsoil for temporary construction site access roads
    • No special vehicles required for delivery and removal
    • Can be laid without earthworks
    • Simple installation
    • Use of the construction road in flooded areas possible

    Technical Data

    reference projects

    Plastic Construction Road

    Plastic Construction Road at the University Hospital in Tübingen

    Read more

    downloadcenter


    • Image Brochure

      Our entire product and service portfolio for you to download


      Download
    • Technical Data Trench Shoring

      Technical data of our trench shoring to download


      Download
    • Instructions for use E+S steel site road

      Trench Shoring


      Download
    • Instructions for use plastic side road

      Trench Shoring


      Download

    contact person

    Nicole Wehrle
    Productmanager Trench Shoring
    +49 172 1736227
    nicole.wehrle@terra-infrastructure.com

    Contact now

    back to all products