Construction of the new Ihrhove railway station as part of the modernisation of the railway line between Bremen and Groningen (Wunderline)

Categorie: References

Product type designation


  • Sheet pile wall comprising partially coated double sheet piles, type tkI 603, with a length of seven metres




Challenge/client’s problem


  • The new station is adjacent to a biotope. A 350-metre-long sheet pile wall was erected to provide protection for the biotope and to serve as a retaining wall for the platform
  • Partial coating of the sheet pile wall on the visible section to provide Corrosion protection
  • The sheet pile wall was erected at a time when train services were running, in extremely confined spaces (a 4-metre-wide working area)
  • Very limited space for positioning the piles
  • Protection of the biotope remained a high priority during the construction work (use of bio-oil in all machines, high-frequency, low-vibration technology for driving the double sheet piles, use of excavator mats for the temporary Site road)




Solution / Client benefits


  • Supply of partially coated double sheet piles, type tkl 603
  • Precise coordination of material deliveries with the construction schedule, ensuring that a day’s supply of double sheet piles was always available on site




Special features


  • Protection of the adjacent biotope
  • Construction of the sheet pile wall whilst train services continued to run, in a very confined space
  • No additional coating required for the installed sheet piles (careful handling on the site and precise installation)




Facts & Figures


Product designation, quantity where applicable

284 tkl 603 double sheet piles (seven metres in length); two tkl 603 single piles (seven metres in length); all sheet piles partially coated to a length of 1.5 metres

Project

New construction of Ihrhove railway station as part of the modernisation of the railway line between Bremen and Groningen (Wunderline)

Date (month, year)

May/June 2025

Client

Deutsche Bahn AG

Execution of work

Heisig Spezialtief- and Harbour Constructions GmbH, Winsen (Aller)