NEW CONSTRUCTION OF A SHEET PILE WALL FOR SLOPE STABILIZATION

NEW CONSTRUCTION OF A SHEET PILE WALL FOR SLOPE STABILIZATION

The gravity wall in Gennerstraße in Hürth was to be replaced by a sheet pile wall clad with L-stones in spring 2018. For the executing construction company, we took over the entire technical planning of the sheet pile wall and supplied the necessary material. A total of 54 tons of L604 steel sheet pile sections in lengths of six to 9.5 meters were used.

The construction work was carried out in sections, i.e. part of the existing concrete wall was demolished and the sheet pile wall was installed in its place. Due to the existing historical buildings, we used pre-drilling and vibration for the installation. We produced the required radius at a road intersection with seven construction piles from our own production.

The project was calculated to take four weeks to complete. Thanks to our customized logistics concept and high-performance machine technology, it was completed in only 18 days.

you might also be interested in

  • Demountable flood protection with the terra stop log system

    A reinforced concrete plinth and a demountable flood protection wall will prevent flood-waters from threatening the building in future.


    To the post
  • Dresden-Gholis Flood Protection System

    In the years 2002 and 2013, the Gohlis district of Dresden was completely flooded by the river Elbe. To permanently protect this part of town, we installed a complete flood protection system.


    To the post
  • Concrete Pile Breakers in Mackay Whitsunday Region, QLD

    Pile breakers dramatically increase productivity and safety when compared to conventional jack-hammer breaking. The $148 million Forgan Bridge project is a signature project for the department in the Mackay/Whitsunday Region.


    To the post