PARKING GARAGE RETAINING WALL - CONSTRUCTION OF A PARKING GARAGE
Within the scope of this construction project, a retaining wall made of anchored LARSSEN steel sheet pile sections was provided, as this was required for the up to 10.30 m deep terrain slopes.A multi-storey parking lot was to be built on the site of the thyssenkrupp Quarter in Essen. As the ground had up to 10.30-meter-deep slopes, permanent ground stabilization was necessary. In coordination with thyssenkrupp Real Estate GmbH, the executing construction company decided in favor of a retaining wall made of anchored LARSSEN steel sheet pile sections. A total of 720 tons of LARSSEN 606 n in lengths of up to 14.30 meters were installed.
Data & Facts
you might also be interested in
-
Rain Overflow Basin in Chemnitz
Renovation of sewer, electricity, gas, drinking water, lighting and communication and construction of a storm water overflow structure in the area of the traffic junction.
To the post -
Stokes Hill Wharf Fender Piles
terra infrastructure supplied both our müller MS32HFV vibro and BSP CX110 impact hammer to Advance Civil and Engineering to install 22 x 32m long fender piles on their Stokes Hill Wharf upgrade.
To the post -
Saxony-Anhalt is also battening down its hatches
Since the “flood of the century” in 2002, Saxony-Anhalt has completed a whole range of flood defence measures, especially for upgrading dykes. One weak spot was the Elbtor alongside the River Elbe in Schönebeck.
To the post