PLASTIC SITE ROAD.
Our plastic site road features a combination of low weight and high load-bearing capacity. It is easy to lay, ensures optimal weight distribution, and can be installed on practically any surface.
The plastic site road is a genuine lightweight. A single truck can transport up to 75 panels, which keeps transport costs to a minimum. To ensure maximum flexibility, the laying service is carried out by the customer. Thus, it is possible to deliver the sheets at short notice. This makes the plastic construction road a particularly economical solution for many applications. It is not only suitable for construction sites, widening existing roads, or as storage space, but equally for use as a crane or assembly platform for wind power, line construction, or photovoltaic systems. Fitted with a specially designed geotextile underlay, the plastic site road can be used to protect sensitive surfaces such as natural stone or precast concrete paving.
SPECIFICATIONS
- Dimensions: 3.000 mm x 2.400 mm x 46 mm
- Weight: 285 kg/panel
- Dimensions: 3.000 mm x 2.400 mm x 47 mm
- Weight: 295 kg/panel
- Surface: profiled on both sides
- Load capacity: approx. 160 t/m² (depending on substrate)
- Transport: 75 panels/truck
- Low weight, high load capacity
- Easy and fast installation, without special vehicles
- High laying speed
- Fixation and protection of the subgrade
- Cost-effective alternative to other temporary construction road systems



STEEL CONSTRUCTION ROAD.
Our E+S steel site road system provides great freedom of mobility as well as a host of technical options and broad scope for cutting costs. The site road consists of heavy-duty angles laid lengthwise and special profiles laid crosswise. Its simple design and special connectors make installation a very straightforward matter. The speed of laying is relatively high, as an excavator lifts the elements one after another from a reversing truck. The sections are then connected together with straps.
SPECIFICATIONS
- Dimensions: 2.340 mm x 3.800 mm x 160 mm
- Weight: 869 kg
- Load: 12 t axle load
- For highest load requirements
- Protection of the subsoil for temporary construction site access roads
- No special vehicles required for delivery and removal
- Can be laid without earthworks
- Simple installation
- Use of the construction road in flooded areas possible
reference projects

Plastic Construction Road
Plastic Construction Road at the University Hospital in Tübingen
Read moredownloadcenter