Temporary coastal protection for the construction of an arena at Timmendorfer Strand

Categorie: References

Product type designation


  • E+S linear shoring




Challenge/customer problem


  • Construction of the arena was technically demanding, logistically tight and subject to clear coastal and nature conservation requirements
  • Creation of a working platform from the foot of the dunes to the water’s edge (3-metre difference in height)
  • Protection of the beach in the vicinity of the arena; prevention of sand erosion




Solution / Customer benefits


  • Protection of the water’s edge against seawater using Beams and panels from the E+S linear shoring system
  • The beams and panels were delivered up to three weeks before the start of the event; during transport along the beach to their respective installation points, a wheel loader transported the elements, and an excavator drove the beams into the ground
  • The beams had a length of around 3.50 metres and were embedded approximately 1.50 metres deep into the ground; the panels were 2.32 metres high and 3 metres wide
  • The shoring, which as a structure ultimately serves the same function as a simple sheet pile wall, was not used in this case to transfer the stadium’s load, but solely for protection of the deposited sand from the waves
  • The temporary shoring, developed from practical experience in coastal and infrastructure engineering, proved to be a safe and rapid solution; its use offered significant advantages over other methods: it could be installed relatively quickly and without difficulty, and, in combination with a geotextile, the system met the pre-conditions for the enormous sand movements and for safety during the events




Key features


  • Tight construction window and a strict schedule
  • Project extremely weather-dependent




Facts & Figures


Product name, quantity where applicable

E+S linear shoring; 28 beams and shoring panels, 2.32 metres high and 3 metres wide;

Project

Protecting the foreshore from seawater using Beams and panels from the E+S linear shoring system

Date (month, year)

August 2025

Client

Timmendorfer Strand Niendorf Tourismus GmbH

Execution of work

Ostholstein Group, Northern Division, STRABAG AG, Schleswig-Holstein East Division