Renovation of the sewage pumping station on Breslauer Straße in Germering
Categorie: References
Product type designation
- E&S linear shoring
Challenge/customer problem
- Excavation of a pit approximately 7 to 9 metres deep with deep-seated inflows and a high groundwater level of around 3 metres below ground level (GOK)
- A cost-effective and efficient method was sought to avoid lowering the groundwater level whilst protecting the ground, buildings and local residents
Solution / Customer benefits
- Innovative excavation shoring using RSS liquid soil and E&S linear shoring
- Use of E&S linear shoring is more cost-effective than conventional methods (e.g. sheet piling)
- Protection of the ground, the environment, buildings and local residents from noise and vibrations
- The existing soil was excavated on site, processed and conditioned with additives to form a pumpable, flowable, self-compacting building material, and subsequently returned to the excavation secured by the E&S linear shoring system
Special features
- A combination of RSS liquid soil and E&S linear shoring
- Complex excavation pit without groundwater lowering
- Challenging geotechnical conditions
- Only outer shoring panels were installed, all of which were guided in a rail; the resulting smooth shoring wall formed the basis for the subsequent dismantling and removal of the panels.”
Facts & Figures
Product name, quantity if applicable | E&S linear shoring |
Project | Refurbishment of the sewage pumping station in Germering |
Date (month, year) | July to October 2025 |
Client | Detailed design Amperverband, Special-purpose Association for Wastewater Disposal in Olching |
Contractor | Bau GmbH Herrischried, Wehr |