  • E+S linear shoring




Challenge/customer problem


  • Rapid and sustainable restoration of storm surge protection in accordance with current technical standards
  • The construction site had to be temporarily protected against flooding
  • Tight timeframe




Solution / customer benefits


  • To protect the construction site from being washed over by seawater, the contractor installed a shoring system over a length of 470 metres as a temporary coastal defence
  • Beams and panels from the E+S linear shoring system were used for this purpose
  • In practice, the system offers the advantage of flexible handling and relatively low labour and machinery requirements



Special features


  • Use of a shoring system on the coast within the surf and surge zones
  • Tight construction window and stringent schedule
  • Construction work dependent on weather and tides




Facts & Figures


Product name, quantity where applicable

Shoring panels and beams from the E+S linear shoring system; module length 3.28 metres, beams 4.5 metres

Project

Securing the construction site during the reconstruction of the revetment on the dyke at Presen/Fehmarn using beams and panels from the E+S linear shoring system

Date (month, year)

07/2024 - 12/2024

Client

State Agency for Coastal Protection, National Parks and Marine Conservation Schleswig-Holstein (LKN.SH), Husum

Contractor

Ostholstein Group, Northern Division, STRABAG AG, Schleswig-Holstein East Region