PLASTIC SITE ROAD IN TÜBINGEN
The company used the plastic site road to optimally protect the paved access road to the installation site and the surrounding parking and meadow areas.
NEW BANK FOR THE LOGPORT II IN DUISBURG
Due to the growing demand in the logistics industry, a new logistics centre has been established in the port of Duisburg – Logport II. A new 360 m long embankment has been built.
E+S LINEAR SHORING: SEWER REHABILITATION WORK IN LEIPZIG
The main components of the project included the construction of a storage channel with reliefs made of semi-finished parts in a table construction.
SECURITY IN DOUBLE PACK IN BERLIN-FROHNAU
It was a construction pit with potentially record-breaking dimensions – all of the construction partners involved in the sewer renovation project in Berlin-Frohnau agreed on this.
OFFSHORE WORK IN AN OIL FIELD IN RUSSIA
The Yuri Korchagin oil field is located in the northern part of the Caspian Sea. There, the Lukoil company wanted to build an ice-resistant drilling platform comprising two blocks/coupling units.
LANDFILL REMEDIAL WORKS
Sheet piles were driven into the landfill to collect groundwater. These were coated on both sides and provided with a durable sealant.
CHEMNITZ RAINWATER OVERFLOW SEWAGE TREATMENT PLANT
Remedial works on all media such as sewer, current, gas, drinking water, lightning and communication and construction of a rainwater overflow structure in the area of the traffic junction.
RIVER BANK REINFORCEMENT ON THE MORITIZBACH CREEK IN ZWICKAU
On a length of about 530 meters, the protective walls were reinforced and heightened.
FEED CONVEYOR
Old shafts were uncovered and demolished, and in the course of laying the new pipeline, the original structures were replaced by new shaft structures made of reinforced concrete prefabricates.
LINEAR SHORING ENSURES A LARGE AND SAFE WORKING AREA
The company is using E+S staged linear shoring for the safety of the construction pit and for the construction of the collector.