Blog (35)
RAMMING WORK IN PERMAFROST
New construction of the Sabetta port on the Yamal Peninsula in Russia
DRAINAGE AND DRAINAGE OF THE A7
The dewatering and drainage of the A7 had to be renewed. Drainage pipes along the low-lying carriageway had become leaky and drainage pipes had become blocked.
REINFORCEMENT OF THE DIKE IN MICHELAU
A total of about 1,500 metres of flood protection wall was built. The construction company in charge covered the above-ground part with a lattice wall containing a filling of limestone.
REAR ANCHORAGE STEEL PILE WALL WITH MICRO PILE FOUNDATIONS
On the north bank, an armoured steel sheet pile wall was to be placed in front of the existing bank wall over a length of around 400 metres and anchored back at predetermined points.
JUST-IN-TIME DELIVERY FOR A BRIDGE ABUTMENT
Around 360 tons of sheet piles, type tkL 606 and 607, up to 15 meters in length, including sealing and corner constructions, were made available for axes 10 and 30 in a period of less than two weeks from the time the site ordered them.
PILING OPERATIONS IN SCHWERIN
On the grounds of the Schwerin Water Police Station on the Schwanenhalbinsel, extensive construction work was carried out for the extension of the protective mole.
CONSTRUCTION SITE IN BERLIN-PANKOW
Safety fuse of an excavation on the Prenzlauer Promenade with Berlin casing, which had to be removed after completion of the residential buildings on site.
PLASTIC SITE ROAD IN TÜBINGEN
The company used the plastic site road to optimally protect the paved access road to the installation site and the surrounding parking and meadow areas.
NEW BANK FOR THE LOGPORT II IN DUISBURG
Due to the growing demand in the logistics industry, a new logistics centre has been established in the port of Duisburg – Logport II. A new 360 m long embankment has been built.
E+S LINEAR SHORING: SEWER REHABILITATION WORK IN LEIPZIG
The main components of the project included the construction of a storage channel with reliefs made of semi-finished parts in a table construction.
SECURITY IN DOUBLE PACK IN BERLIN-FROHNAU
It was a construction pit with potentially record-breaking dimensions – all of the construction partners involved in the sewer renovation project in Berlin-Frohnau agreed on this.
OFFSHORE WORK IN AN OIL FIELD IN RUSSIA
The Yuri Korchagin oil field is located in the northern part of the Caspian Sea. There, the Lukoil company wanted to build an ice-resistant drilling platform comprising two blocks/coupling units.
LANDFILL REMEDIAL WORKS
Sheet piles were driven into the landfill to collect groundwater. These were coated on both sides and provided with a durable sealant.
CHEMNITZ RAINWATER OVERFLOW SEWAGE TREATMENT PLANT
Remedial works on all media such as sewer, current, gas, drinking water, lightning and communication and construction of a rainwater overflow structure in the area of the traffic junction.
RIVER BANK REINFORCEMENT ON THE MORITIZBACH CREEK IN ZWICKAU
On a length of about 530 meters, the protective walls were reinforced and heightened.
FEED CONVEYOR
Old shafts were uncovered and demolished, and in the course of laying the new pipeline, the original structures were replaced by new shaft structures made of reinforced concrete prefabricates.
LINEAR SHORING ENSURES A LARGE AND SAFE WORKING AREA
The company is using E+S staged linear shoring for the safety of the construction pit and for the construction of the collector.