GLASS REINFORCEMENT OF THE RIVER DIKE

GLASS REINFORCEMENT OF THE RIVER DIKE

An architecturally appropriate flood protection wall made of brick-lined reinforced concrete, glass and stainless steel frames in the promenade area of the town of Brake.

Flood protection system at the level crossing in Minnesota

Flood protection system at the level crossing in Minnesota

A railway line that crosses the Chippewa River in Minnesota is regularly affected by flooding and should be provided with a flood protection system.

FLOOD PROTECTION SYSTEM IN THE OLD CITY CENTRE OF DRESDEN

FLOOD PROTECTION SYSTEM IN THE OLD CITY CENTRE OF DRESDEN

The city of Dresden lies on several rivers that have burst their banks at regular intervals in recent years. The city and state have therefore been investing in flood protection for years

Steel Section Flood protection
FLOOD PROTECTION SYSTEM IN FARGO, NORTH DAKOTA, USA

FLOOD PROTECTION SYSTEM IN FARGO, NORTH DAKOTA, USA

The city of Fargo is located on the Red River, which repeatedly flooded flood defences and roads during the winter months.

Steel Section Flood protection
PROTECTION OF PRECIOUS HISTORY WITH TERRA BARRY GATE SYSTEM

PROTECTION OF PRECIOUS HISTORY WITH TERRA BARRY GATE SYSTEM

In a major project here in the Elbe hinterland, a combination of a new earth dam and a strengthening of the protective measures using removable stop log elements was realised.

Steel Section Flood protection
Flood protection system for the municipality of Yuyao in China

Flood protection system for the municipality of Yuyao in China

In the municipality of Yuyao, mobile flood protection was installed along a length of about 4,700 metres of the Yuyao River to improve the quality of life of the citizens.

SAXONY-ANHALT IS ALSO SHUTTING THE SCOTTS OUT

SAXONY-ANHALT IS ALSO SHUTTING THE SCOTTS OUT

Since the ‘flood of the century’ in 2002, Saxony-Anhalt has completed a whole row of flood protection measures, especially for dike stabilisation. A weak point

Steel Section Flood protection
FLOOD PROTECTION SYSTEM IN DRESDEN-GOHLIS

FLOOD PROTECTION SYSTEM IN DRESDEN-GOHLIS

The Dresden district of Gohlis was completely flooded by the Elbe in 2002 and 2013. We built a complete flood protection system to provide long-term protection for the district.

Steel Section Flood protection sys
PROTECTION OF THE HISTORIC CITY CENTRE IN DRESDEN

PROTECTION OF THE HISTORIC CITY CENTRE IN DRESDEN

In the aftermath of the disastrous flooding, Dresden has been working to improve Flood protection systems in the affected districts. Extensive construction work is planned and has been in progress since 2006.

Steel Section Flood protection
WALL OF GLASS IN THE VICINITY OF TUMRSCHANZENSTRASSE, MAGDEBURG

WALL OF GLASS IN THE VICINITY OF TUMRSCHANZENSTRASSE, MAGDEBURG

Glass thicknesses precisely matched to different impact loads.

Steel Section Flood protection
90 seconds for 1 metre of safety

90 seconds for 1 metre of safety

The new system is characterized by its quick assembly without special training. Every 90 seconds, one meter of security “grows”.

Machinery Vibratory hammers
RAMMING WORK IN PERMAFROST

RAMMING WORK IN PERMAFROST

New construction of the Sabetta port on the Yamal Peninsula in Russia

DRAINAGE AND DRAINAGE OF THE A7

DRAINAGE AND DRAINAGE OF THE A7

The dewatering and drainage of the A7 had to be renewed. Drainage pipes along the low-lying carriageway had become leaky and drainage pipes had become blocked.

REINFORCEMENT OF THE DIKE IN MICHELAU

REINFORCEMENT OF THE DIKE IN MICHELAU

A total of about 1,500 metres of flood protection wall was built. The construction company in charge covered the above-ground part with a lattice wall containing a filling of limestone.

Steel Section anchor technology
REAR ANCHORAGE STEEL PILE WALL WITH MICRO PILE FOUNDATIONS

REAR ANCHORAGE STEEL PILE WALL WITH MICRO PILE FOUNDATIONS

On the north bank, an armoured steel sheet pile wall was to be placed in front of the existing bank wall over a length of around 400 metres and anchored back at predetermined points.

Steel Section Sheet piles
JUST-IN-TIME DELIVERY FOR A BRIDGE ABUTMENT

JUST-IN-TIME DELIVERY FOR A BRIDGE ABUTMENT

Around 360 tons of sheet piles, type tkL 606 and 607, up to 15 meters in length, including sealing and corner constructions, were made available for axes 10 and 30 in a period of less than two weeks from the time the site ordered them.

Steel Section Sheet piles
PILING OPERATIONS IN SCHWERIN

PILING OPERATIONS IN SCHWERIN

On the grounds of the Schwerin Water Police Station on the Schwanenhalbinsel, extensive construction work was carried out for the extension of the protective mole.

CONSTRUCTION SITE IN BERLIN-PANKOW

CONSTRUCTION SITE IN BERLIN-PANKOW

Safety fuse of an excavation on the Prenzlauer Promenade with Berlin casing, which had to be removed after completion of the residential buildings on site.