PARKING GARAGE RETAINING WALL - CONSTRUCTION OF A PARKING GARAGE
Within the scope of this construction project, a retaining wall made of anchored LARSSEN steel sheet pile sections was provided, as this was required for the up to 10.30 m deep terrain slopes.A multi-storey parking lot was to be built on the site of the thyssenkrupp Quarter in Essen. As the ground had up to 10.30-meter-deep slopes, permanent ground stabilization was necessary. In coordination with thyssenkrupp Real Estate GmbH, the executing construction company decided in favor of a retaining wall made of anchored LARSSEN steel sheet pile sections. A total of 720 tons of LARSSEN 606 n in lengths of up to 14.30 meters were installed.
Data & Facts
Sheet Pile Dilevery
approx. 720 t LARSSEN 606 n in grade S 355 GP in lengths up to 14.3 m
Lock Seal
approx. 5,200 m interlock seal system HOESCH
Corrosion protection/coating
approx. 4700 m² sheet pile coating, Hartmann Bautenschutz, Dortmund
Equipment and anchoring material
320 m waling 2 U 400, anchor plates, bolts, 320 m edge protection, anchor plate waling, 78 pieces ASF round steel anchors, 3" and 3 ½" up to 14 m long, ASF anchors, Anton Schmoll GmbH Verbindungstechnik, Balve
Client
thyssenkrupp Real Estate GmbH, Essen
Testing
API Asmus + Prabucki Ingenieure Beratungsgesellschaft mbH, Essen
Executing Construction Company
ARGE thyssenkrupp Quartier TB, Bottrop; Heinrich Walter Bau, Borken; Eurovia Teerbau GmbH, Bottrop; G. Papenburg AG, Schwarmstedt, Grundbau Jansen GmbH, Linnich
Execution Planning
ECE; API Asmus Prabucki Ingenieure, Essen; thyssenkrupp Infrastructure GmbH, Essen
Testing
Ing. Büro Hamelmann Karvanek, Essen
you might also be interested in
-
Demountable flood protection with the terra stop log system
A reinforced concrete plinth and a demountable flood protection wall will prevent flood-waters from threatening the building in future.
To the post -
Dresden-Gholis Flood Protection System
In the years 2002 and 2013, the Gohlis district of Dresden was completely flooded by the river Elbe. To permanently protect this part of town, we installed a complete flood protection system.
To the post -
Safety in a double pack in Berlin-Frohnau
It was an excavation support of record-breaking dimensions - all construction partners involved in the sewer rehabilitation project in Berlin-Frohnau agreed on this.
To the post