Source 20190308 LB profile ankertechnik Michelau 2 2

Steel Section - Sheet Piling

DIKE RETROFITTING IN MICHELAU

DIKE RETROFITTING IN MICHEALAU

In the municipality of Michelau, the existing flood protection was to be upgraded to the state of the art. The aim was to provide protection against floods that statistically occur once every 100 years.

We supplied the material for the second construction phase of the protection measure: This involved 675 tons of sealed steel sheet pile profiles tk L 603 DB, most of them four meters long. The approximately 1,250 planks had to be processed exactly on the specified date. As it is very difficult to deliver such large quantities on the exact day, around one third of the total quantity was made available as used material. In this way, delays in rolling could be compensated by a combination of used and new screeds.

In total, a flood line of about 1,500 meters was created. The above-ground part was clad by the executing contractor with a lattice wall containing a filling of limestones.

you might also be interested in

  • Pioneering achievement on the high seas

    This marks the beginning of a new era in wind energy. The first German wind farm, “alpha ventus”, has been built in 30 meters of water some 45 kilometers north of the island of Borkum.


    To the post
  • Back anchoring steel sheet pile wall with micropiles

    On the north bank, an armored steel sheet pile wall was to be placed in front of the existing seawall over a length of around 400 meters and tied back at specified points.


    To the post
  • Flood Protection in Fargo, North Dakota, USA

    The city of Fargo is located on the Red River, which repeatedly flooded existing flood defences and roads during the winter months.


    To the post